The Watt Report

Never miss a post—subscribe below to get the latest updates and exclusive content delivered straight to your inbox.

Everyone's arguing over who pays. The transformer line is three years long.

Sep 1, 2026

Everyone's arguing over who pays. The transformer line is three years long.

Six grid operators just filed their answers on large-load cost allocation. Not one of those filings shortens a factory queue.

Read more
arrow-right
Crane cleared its last hurdle at Three Mile Island. Nobody else inherits the shortcut.

Aug 25, 2026

Crane cleared its last hurdle at Three Mile Island. Nobody else inherits the shortcut.

The nuclear PPA playbook — and why the next deal looks nothing like the first.

Read more
arrow-right
A $2.8 billion line, an $80 million deposit, and one 250 MW customer

Aug 18, 2026

A $2.8 billion line, an $80 million deposit, and one 250 MW customer

A billion-dollar transmission line, a refundable advance under $80 million, and a pledge that says none of this reaches your bill.

Read more
arrow-right
Texas froze the queue. Four days later, someone sold 1.25 GW around it.

Aug 11, 2026

Texas froze the queue. Four days later, someone sold 1.25 GW around it.

Energy Vault's largest-ever contract isn't a battery deal. It's a bet that speed-to-power is the product now, and the grid is the competitor.

Read more
arrow-right
The gas bridge is becoming the house

Aug 4, 2026

The gas bridge is becoming the house

Enverus says 40% of new data center capacity is going off-grid — but the gas demand attached to that same forecast describes a bridge carrying far less weight than the headline implies.

Read more
arrow-right
The pledge doesn't set your rate. Here's what does.

Jul 28, 2026

The pledge doesn't set your rate. Here's what does.

Twenty-three governors signed a promise in Washington. The documents that actually allocate cost were signed in Richmond, Atlanta, and Albany — most of them before the pledge existed.

Read more
arrow-right